Elevator Solutions
Built for Projects.
EN81-compliant systems. BOQ-ready documentation. Modular WITTUR installation that reduces your project timeline. Sanyo ISquare speaks the language of site engineers and project managers.
Specify with Confidence
Full system specifications for MRL gearless traction elevators — the most specified type for South India's mid-rise and high-rise residential projects.
| Parameter | Specification |
|---|---|
| Rated Load | 320 kg – 2,500 kg |
| Speed | 0.5 – 2.5 m/s (MRL) |
| Max Travel Height | Up to 60 m (MRL) |
| Door Type | WITTUR DE-AIII / DE-AI |
| Door Width | 800 – 1100 mm |
| Machine Type | Sicor Gearless Traction |
| Rope | Pfeifer Drako IWRC 8×19 |
| Guide Rails | Monteferro Italy T-section |
| Safety Standard | EN81-20 / EN81-50 |
| Fire Rating (Door) | 120 minutes (EN81-58) |
| Control System | VVVF Drive + WECO/IRIS Control |
| Rescue Device | ARD — Automatic Rescue Device |
Specifications are typical values. Final specification subject to project review and site conditions.
Why Builders Specify Sanyo ISquare
Engineering advantages that reduce your installation timeline, improve compliance posture, and lower post-handover callbacks.
30% Faster Installation
WITTUR's modular pre-engineered door cassette system reduces site assembly time. Pre-wired control panels arrive ready for connection — cutting overall installation lead time significantly.
Shaft Flexibility
Our MRL systems can be adapted to non-standard shaft dimensions. We work with your structural engineer from design stage to ensure compatibility without costly rectification.
BOQ-Ready Documentation
We provide complete Bill of Quantities documentation with itemised European-sourced components — making the procurement process transparent and defensible for your PMC and client.
EN81 Certificate with Every Supply
Each elevator system is supplied with EN81 test certificates, WITTUR fire door certification, Sicor machine datasheets, and Pfeifer Drako rope compliance documents.
Pre-Wired Control Panels
Control cabinets are pre-wired and factory-tested at our Bangalore facility before dispatch. Site connection is straightforward, reducing electrician time on-site.
Dedicated Project Support
A dedicated project engineer is assigned to every builder project — from shaft drawing review through installation supervision to commissioning sign-off.
Every Certificate. Every Time.
We provide a complete compliance documentation package with every elevator supply.
Builder FAQs
Common technical questions from project managers and site engineers.
Ready to Specify?
Our technical team will review your project drawings, recommend the right system, and prepare a complete BOQ within 48 hours.